Register now for Cassidian Communications's on-demand webinar "Next Generation Communications: What Does It Mean to You? Part 2: In the Field"
      Subscribe in NewsGator Online   Subscribe in Bloglines     

IT think tank weighs in on LightSquared/GPS debate

Aug 24, 2011 5:13 PM

The consumer demand for satellite-based two-way communication systems is not as strong as once envisioned, while the demand for terrestrial broadband is intense and growing. It is therefore critical for the Federal government to repurpose satellite spectrum for terrestrial broadband use.

In this filing before the FCC on the matter of LightSquared Request for Modification of its Authority for an Ancillary Terrestrial Component, the Information Technology and Innovation Foundation argues that a number of spectrum swap and reassignment measures have been proposed, each of which also needs to be explored. It appears that many, but not all, of the problems with existing GPS devices are the result of poor engineering practice and failure to abide by DoD directives on noise immunity. Additional testing can determine the extent to which this is the case.

It’s important to resolve this matter in such a way as to facilitate future reallocation of spectrum currently assigned to satellite services to terrestrial ones, even if a portion of the legacy installed base of low-cost GPS devices is impacted.

Download the FCC filing here.



PODCASTS

Keep updated with communications industry topics with Urgent Communications' podcasts.

WHITE PAPERS

Download free white papers that delve into the intricacies of the mobile communications industry.

E-NEWSLETTERS

Check out our latest edition of Urgent Communications Today. Not a subscriber? Subscribe now!

Most Popular Articles

Remember to feed the elephants: What public-safety LTE issues still need to be addressed

NTIA suspends public-safety LTE projects using federal funds

Las Vegas tabs Harris for LTE pilot

Solving in-building noise issues

Public safety anxiously awaits 700 MHz broadband direction

May Web Poll

Check for final results in a future issue of Urgent Communications.

Hot Spots

Project 25

Interoperability

Rebanding

PSAP

Browse Back Issues