Subscribe in NewsGator Online   Subscribe in Bloglines     

High bids for 700 MHz break key thresholds; no new bids for D Block

Jan 31, 2008 11:15 AM, By Donny Jackson

Action in this morning’s 17th round of the 700 MHz auction saw the total high bids reach levels that meet congressional budget objectives and a C Block bid that would trigger open-access requirements for networks operating in that swath of spectrum, but bidding on the D Block remains dormant.

In round 17, cumulative high bids on all 60 MHz of spectrum available reached $12.789 billion. From a budgetary perspective, Congress needed the auction to garner at least $12 billion—$2 billion to pay for previous obligations and $10 billion in new revenue to pay for new appropriations, including $1 billion in public-safety interoperability grants that should be announced this spring.

In the C Block auction, round 17 produced a high bid of $4.713 billion, exceeding the FCC’s $4.6 billion reserve price for the spectrum. FCC rules dictate that wireless networks operating in the C Block observe open-access rules that are designed to loosen carriers’ control of the devices and applications used on their networks. If the C Block reserve price was not met, the spectrum would have been reauctioned without the open-access requirement.

Once again, there were no new bids on the D Block, a 10 MHz nationwide swath that the FCC wants coupled with public-safety spectrum to provide the spectral foundation for a shared, nationwide network built to public-safety standards. After a $472 million bid on the D Block in the first round, there has been no further action on those airwaves in the last 16 rounds. The FCC established a $1.3 billion reserve price for the D Block.

Round 18 in the auction is scheduled to begin at 11:30 EST.


Acceptable Use Policy
blog comments powered by Disqus

ONLINE SHOWCASE

Get vendor information in this special online showcase.

WHITE PAPERS

Download these new free public safety white papers from Motorola.

E-NEWSLETTERS

Check out our latest edition of Urgent Communications Today and Tech Talk. Not a subscriber? Subscribe now!

Hot Spots

Project 25

Interoperability

Rebanding

PSAP

Essential Reading

A corner turned

Let the buyer beware

When measurements aren't feasible

Verizon, AT&T both plan 2010 launch for LTE networks

Motorola shuffles the deck

Most Popular Articles

GAO report casts dark shadow on GPS

New York City's new broadband network could be model for first responders

Tower Shadowing: Friend and foe

A Big Voice in the Big Apple

Making Twitter work for public safety

Browse Back Issues