https://urgentcomm.com/wp-content/themes/ucm_child/assets/images/logo/footer-new-logo.png
  • Home
  • News
  • Multimedia
    • Back
    • Multimedia
    • Video
    • Podcasts
    • Galleries
    • IWCE’s Video Showcase
    • IWCE 2022 Winter Showcase
    • IWCE 2023 Pre-event Guide
  • Commentary
    • Back
    • Commentary
    • Urgent Matters
    • View From The Top
    • All Things IWCE
    • Legal Matters
  • Resources
    • Back
    • Resources
    • Webinars
    • White Papers
    • Reprints & Reuse
  • IWCE
    • Back
    • IWCE
    • Conference
    • Special Events
    • Exhibitor Listings
    • Premier Partners
    • Floor Plan
    • Exhibiting Information
    • Register for IWCE
  • About Us
    • Back
    • About Us
    • Contact Us
    • Advertise
    • Terms of Service
    • Privacy Statement
    • Cookie Policy
  • Related Sites
    • Back
    • American City & County
    • IWCE
    • Light Reading
    • IOT World Today
    • Mission Critical Technologies
    • TU-Auto
  • In the field
    • Back
    • In the field
    • Broadband Push-to-X
    • Internet of Things
    • Project 25
    • Public-Safety Broadband/FirstNet
    • Virtual/Augmented Reality
    • Land Mobile Radio
    • Long Term Evolution (LTE)
    • Applications
    • Drones/Robots
    • IoT/Smart X
    • Software
    • Subscriber Devices
    • Video
  • Call Center/Command
    • Back
    • Call Center/Command
    • Artificial Intelligence
    • NG911
    • Alerting Systems
    • Analytics
    • Dispatch/Call-taking
    • Incident Command/Situational Awareness
    • Tracking, Monitoring & Control
  • Network Tech
    • Back
    • Network Tech
    • Interoperability
    • LMR 100
    • LMR 200
    • Backhaul
    • Deployables
    • Power
    • Tower & Site
    • Wireless Networks
    • Coverage/Interference
    • Security
    • System Design
    • System Installation
    • System Operation
    • Test & Measurement
  • Operations
    • Back
    • Operations
    • Critical Infrastructure
    • Enterprise
    • Federal Government/Military
    • Public Safety
    • State & Local Government
    • Training
  • Regulations
    • Back
    • Regulations
    • Narrowbanding
    • T-Band
    • Rebanding
    • TV White Spaces
    • None
    • Funding
    • Policy
    • Regional Coordination
    • Standards
  • Organizations
    • Back
    • Organizations
    • AASHTO
    • APCO
    • DHS
    • DMR Association
    • ETA
    • EWA
    • FCC
    • IWCE
    • NASEMSO
    • NATE
    • NXDN Forum
    • NENA
    • NIST/PSCR
    • NPSTC
    • NTIA/FirstNet
    • P25 TIG
    • TETRA + CCA
    • UTC
Urgent Communications
  • NEWSLETTER
  • Home
  • News
  • Multimedia
    • Back
    • Video
    • Podcasts
    • Omdia Crit Comms Circle Podcast
    • Galleries
    • IWCE’s Video Showcase
    • IWCE 2023 Pre-event Guide
    • IWCE 2022 Winter Showcase
  • Commentary
    • Back
    • All Things IWCE
    • Urgent Matters
    • View From The Top
    • Legal Matters
  • Resources
    • Back
    • Webinars
    • White Papers
    • Reprints & Reuse
    • UC eZines
    • Sponsored content
  • IWCE
    • Back
    • Conference
    • Why Attend
    • Exhibitor Listing
    • Floor Plan
    • Exhibiting Information
    • Join the Event Mailing List
  • About Us
    • Back
    • About Us
    • Contact Us
    • Advertise
    • Cookie Policy
    • Terms of Service
    • Privacy Statement
  • Related Sites
    • Back
    • American City & County
    • IWCE
    • Light Reading
    • IOT World Today
    • TU-Auto
  • newsletter
  • In the field
    • Back
    • Internet of Things
    • Broadband Push-to-X
    • Project 25
    • Public-Safety Broadband/FirstNet
    • Virtual/Augmented Reality
    • Land Mobile Radio
    • Long Term Evolution (LTE)
    • Applications
    • Drones/Robots
    • IoT/Smart X
    • Software
    • Subscriber Devices
    • Video
  • Call Center/Command
    • Back
    • Artificial Intelligence
    • NG911
    • Alerting Systems
    • Analytics
    • Dispatch/Call-taking
    • Incident Command/Situational Awareness
    • Tracking, Monitoring & Control
  • Network Tech
    • Back
    • Cybersecurity
    • Interoperability
    • LMR 100
    • LMR 200
    • Backhaul
    • Deployables
    • Power
    • Tower & Site
    • Wireless Networks
    • Coverage/Interference
    • Security
    • System Design
    • System Installation
    • System Operation
    • Test & Measurement
  • Operations
    • Back
    • Critical Infrastructure
    • Enterprise
    • Federal Government/Military
    • Public Safety
    • State & Local Government
    • Training
  • Regulations
    • Back
    • Narrowbanding
    • T-Band
    • Rebanding
    • TV White Spaces
    • None
    • Funding
    • Policy
    • Regional Coordination
    • Standards
  • Organizations
    • Back
    • AASHTO
    • APCO
    • DHS
    • DMR Association
    • ETA
    • EWA
    • FCC
    • IWCE
    • NASEMSO
    • NATE
    • NXDN Forum
    • NENA
    • NIST/PSCR
    • NPSTC
    • NTIA/FirstNet
    • P25 TIG
    • TETRA + CCA
    • UTC
acc.com

Commentary Print


New day, new problem

New day, new problem

The good news is that the Canadian authorities agreed to grandfather approximately 80% of the erroneously granted systems. The bad news is that numerous public-safety licensees now face a drastic reduction of their ERP, which unquestionably will result in a loss of coverage.
  • Written by Urgent Communications Administrator
  • 1st June 2010

The FCC has initiated a series of proceedings which seek to correct the effective radiated power, or ERP, of numerous 800 MHz licenses in the Canadian border area. Many of these licensees are public-safety entities.

By way of background, these are licenses granted by the FCC that allow more power than typically is permitted in the border area. Apparently, a variety of issues led to these improper grants.

The errors were discovered when the agreement regarding the 800 MHz rebanding plan for the U.S./Canada border was reached. The FCC has been working with Canadian authorities to see if these systems, most of which have been in operation for many years, could be grandfathered regarding their existing power output.

The good news is that the Canadian authorities agreed to grandfather approximately 80% of the erroneously granted systems. The bad news is that numerous public-safety licensees now face a drastic reduction of their ERP, which unquestionably will result in a loss of coverage.

The reduction of coverage area for public-safety radio systems is a significant issue. This is not a rebanding issue — although it was discovered because of rebanding — so even if there is a technical solution (adding transmitter sites, for example), there is no funding coming from Sprint Nextel for the change. Thus, licensees are faced with figuring out whether their systems can be reconfigured and making those modifications at their own cost. However, in some areas, there may not be any options at 800 MHz.

Obviously, this is a big problem for cash-strapped municipalities in areas where there are options. These licensees are asking why this is an issue now, when it was the FCC (in some cases) that made the error (in the pre-ULS era) and these systems have operated without causing interference for years.

Since the orders came out just before this writing, it’s difficult to know how this will play out, but it represents a potentially huge impasse to completing rebanding in the Canadian border area anytime soon. The FCC already had instructed the Transition Administrator to hold frequency reconfiguration agreements, or FRAs, of impacted licensees while the issue was worked out, and now this result will cause additional delays as licensees attempt to cure potentially huge coverage holes.

While Canadian border licensees struggle with this issue, non-border licensees are in many cases struggling with the radio audit process, post-rebanding. Specifically, Sprint Nextel is closely reviewing returned radios from rebanded licensees to ensure that the radios were in fact operational. Apparently, some licensees were returning non-functional radios (sometimes just a radio case with no radio “guts”), or radios that operate in other frequency bands.

Thus, it would be wise for licensees to perform their own audit, prior to returning radios, to make sure that returned radios are functional. When non-functional radios are returned, licensees will be expected to pay for the new radio that they obtained from Sprint Nextel.

On another rebanding front, there is progress. The FCC has released an order that creates a rebanding plan for Puerto Rico. With this order, the Transition Administrator can begin to issue replacement frequencies, and licensees who have had FRAs for a considerable period of time, but been unable to reband, can proceed.

Release of the Puerto Rico band plan leaves only the Mexican border area as a region in need of a plan. It is hoped that this plan can been agreed to by the relevant parties sometime soon, so that rebanding can be completed.

What do you think? Tell us in the comment box below.

Alan Tilles is counsel to numerous entities in the private radio and Internet industries. He is a partner in the law firm of Shulman Rogers Gandal Pordy & Ecker and can be reached at [email protected].

Related Stories

  • Mexican border rebanding may wait until next year — at least
  • Border rebanding plans take shape
  • Rebanding turns a significant corner
Tags: Commentary Print Networks & Systems Commentary Policy & Law Commentary

Most Recent


  • NG911 needed to secure our communities and nation
    As the new Congress begins its work in earnest, we look forward to continued progress in funding the transition to IP-based next-generation 911 (NG911) technology. Our nation’s 911 systems are critical to ensuring the safety and security of our communities, and nationwide implementation of NG911 will ensure these systems can leverage the most advanced communications […]
  • Do smart cities make safer cities?
    According to the United Nations, two out of three people will live in urban areas by 2050. This increase in city populations will undoubtedly put an even greater strain on government service providers.  Faced with the growing demand of residents for increasingly agile and efficient public services, cities must be able to adapt quickly and […]
  • Swatting has serious implications and shouldn’t be ignored
    A rash of “swatting” incidents occurred across the country in September. Swatting is the practice of falsely reporting an emergency to elicit a law-enforcement response, ideally one involving the SWAT (special weapons and tactics) team.  As an example, Cincinnati-area high school was placed on lockdown when a 911 call was made to report an active-shooter […]
  • Reflections on recent LTE outages
    Rogers Communications Canada experienced a national service outage on July 8, 2022, that halted LTE communications for millions of Canadians, including public-safety agencies counting on mobile broadband for operations. In light of this jarring failure, should public-safety leaders rethink plans to collapse all wireless communications onto a single wireless technology platform operated by a service […]

Leave a comment Cancel reply

To leave a comment login with your Urgent Comms account:

Log in with your Urgent Comms account

Or alternatively provide your name, email address below:

Your email address will not be published. Required fields are marked *

Related Content

  • Unlocking the power of ESInets: Different NG911 provisioning approaches exist; level of control is key differentiator
  • Ransomware? Let's call it what it really is: extortionware
  • Redefining communications for today’s mobile workforces
  • Hi-tech sewer can help safeguard public health, environment and economies

Commentary


Updated: How ‘sidelink’ peer-to-peer communications can enhance public-safety operations

  • 1
27th February 2023

NG911 needed to secure our communities and nation

24th February 2023

How 5G is making cities safer, smarter, and more efficient

26th January 2023
view all

Events


UC Ezines


IWCE 2019 Wrap Up

13th May 2019
view all

Twitter


UrgentComm

Zipline delivery drone docks, charges by itself dlvr.it/SlBNWy

20th March 2023
UrgentComm

State and local leaders can alleviate the burden on public-safety personnel by tackling three workforce trends dlvr.it/SlBH89

20th March 2023
UrgentComm

6G is shaping up to disappoint, and the industry can blame itself dlvr.it/Sl918J

20th March 2023
UrgentComm

Change is coming to the network detection and response (NDR) market dlvr.it/Sl4cts

18th March 2023

Newsletter

Sign up for UrgentComm’s newsletters to receive regular news and information updates about Communications and Technology.

Expert Commentary

Learn from experts about the latest technology in automation, machine-learning, big data and cybersecurity.

Business Media

Find the latest videos and media from the market leaders.

Media Kit and Advertising

Want to reach our digital and print audiences? Learn more here.

DISCOVER MORE FROM INFORMA TECH

  • American City & County
  • IWCE
  • Light Reading
  • IOT World Today
  • Mission Critical Technologies
  • TU-Auto

WORKING WITH US

  • About Us
  • Contact Us
  • Events
  • Careers

FOLLOW Urgent Comms ON SOCIAL

  • Privacy
  • CCPA: “Do Not Sell My Data”
  • Cookie Policy
  • Terms
Copyright © 2023 Informa PLC. Informa PLC is registered in England and Wales with company number 8860726 whose registered and Head office is 5 Howick Place, London, SW1P 1WG.