https://urgentcomm.com/wp-content/themes/ucm_child/assets/images/logo/footer-new-logo.png
  • Home
  • News
  • Multimedia
    • Back
    • Multimedia
    • Video
    • Podcasts
    • Galleries
    • IWCE’s Video Showcase
    • IWCE 2022 Winter Showcase
    • IWCE 2023 Pre-event Guide
  • Commentary
    • Back
    • Commentary
    • Urgent Matters
    • View From The Top
    • All Things IWCE
    • Legal Matters
  • Resources
    • Back
    • Resources
    • Webinars
    • White Papers
    • Reprints & Reuse
  • IWCE
    • Back
    • IWCE
    • Conference
    • Special Events
    • Exhibitor Listings
    • Premier Partners
    • Floor Plan
    • Exhibiting Information
    • Register for IWCE
  • About Us
    • Back
    • About Us
    • Contact Us
    • Advertise
    • Terms of Service
    • Privacy Statement
    • Cookie Policy
  • Related Sites
    • Back
    • American City & County
    • IWCE
    • Light Reading
    • IOT World Today
    • Mission Critical Technologies
    • TU-Auto
  • In the field
    • Back
    • In the field
    • Broadband Push-to-X
    • Internet of Things
    • Project 25
    • Public-Safety Broadband/FirstNet
    • Virtual/Augmented Reality
    • Land Mobile Radio
    • Long Term Evolution (LTE)
    • Applications
    • Drones/Robots
    • IoT/Smart X
    • Software
    • Subscriber Devices
    • Video
  • Call Center/Command
    • Back
    • Call Center/Command
    • Artificial Intelligence
    • NG911
    • Alerting Systems
    • Analytics
    • Dispatch/Call-taking
    • Incident Command/Situational Awareness
    • Tracking, Monitoring & Control
  • Network Tech
    • Back
    • Network Tech
    • Interoperability
    • LMR 100
    • LMR 200
    • Backhaul
    • Deployables
    • Power
    • Tower & Site
    • Wireless Networks
    • Coverage/Interference
    • Security
    • System Design
    • System Installation
    • System Operation
    • Test & Measurement
  • Operations
    • Back
    • Operations
    • Critical Infrastructure
    • Enterprise
    • Federal Government/Military
    • Public Safety
    • State & Local Government
    • Training
  • Regulations
    • Back
    • Regulations
    • Narrowbanding
    • T-Band
    • Rebanding
    • TV White Spaces
    • None
    • Funding
    • Policy
    • Regional Coordination
    • Standards
  • Organizations
    • Back
    • Organizations
    • AASHTO
    • APCO
    • DHS
    • DMR Association
    • ETA
    • EWA
    • FCC
    • IWCE
    • NASEMSO
    • NATE
    • NXDN Forum
    • NENA
    • NIST/PSCR
    • NPSTC
    • NTIA/FirstNet
    • P25 TIG
    • TETRA + CCA
    • UTC
Urgent Communications
  • NEWSLETTER
  • Home
  • News
  • Multimedia
    • Back
    • Video
    • Podcasts
    • Omdia Crit Comms Circle Podcast
    • Galleries
    • IWCE’s Video Showcase
    • IWCE 2023 Pre-event Guide
    • IWCE 2022 Winter Showcase
  • Commentary
    • Back
    • All Things IWCE
    • Urgent Matters
    • View From The Top
    • Legal Matters
  • Resources
    • Back
    • Webinars
    • White Papers
    • Reprints & Reuse
    • UC eZines
    • Sponsored content
  • IWCE
    • Back
    • Conference
    • Why Attend
    • Exhibitor Listing
    • Floor Plan
    • Exhibiting Information
    • Join the Event Mailing List
  • About Us
    • Back
    • About Us
    • Contact Us
    • Advertise
    • Cookie Policy
    • Terms of Service
    • Privacy Statement
  • Related Sites
    • Back
    • American City & County
    • IWCE
    • Light Reading
    • IOT World Today
    • TU-Auto
  • newsletter
  • In the field
    • Back
    • Internet of Things
    • Broadband Push-to-X
    • Project 25
    • Public-Safety Broadband/FirstNet
    • Virtual/Augmented Reality
    • Land Mobile Radio
    • Long Term Evolution (LTE)
    • Applications
    • Drones/Robots
    • IoT/Smart X
    • Software
    • Subscriber Devices
    • Video
  • Call Center/Command
    • Back
    • Artificial Intelligence
    • NG911
    • Alerting Systems
    • Analytics
    • Dispatch/Call-taking
    • Incident Command/Situational Awareness
    • Tracking, Monitoring & Control
  • Network Tech
    • Back
    • Cybersecurity
    • Interoperability
    • LMR 100
    • LMR 200
    • Backhaul
    • Deployables
    • Power
    • Tower & Site
    • Wireless Networks
    • Coverage/Interference
    • Security
    • System Design
    • System Installation
    • System Operation
    • Test & Measurement
  • Operations
    • Back
    • Critical Infrastructure
    • Enterprise
    • Federal Government/Military
    • Public Safety
    • State & Local Government
    • Training
  • Regulations
    • Back
    • Narrowbanding
    • T-Band
    • Rebanding
    • TV White Spaces
    • None
    • Funding
    • Policy
    • Regional Coordination
    • Standards
  • Organizations
    • Back
    • AASHTO
    • APCO
    • DHS
    • DMR Association
    • ETA
    • EWA
    • FCC
    • IWCE
    • NASEMSO
    • NATE
    • NXDN Forum
    • NENA
    • NIST/PSCR
    • NPSTC
    • NTIA/FirstNet
    • P25 TIG
    • TETRA + CCA
    • UTC
acc.com

Wireless Networks


Connecting the dots

Connecting the dots

Once the LMR system is designed, the next big step is to link the sites, with myriad technologies available for doing so, each with distinct advantages and disadvantages.
  • Written by Urgent Communications Administrator
  • 1st October 2010

After the user-needs assessment has been completed, the radio sites have been located and a radio-frequency plan has been approved, the next step in the design of a private land-mobile radio system is to connect the sites to each other, as well as to dispatch and command-and-control.

There are many different methods and tools to transfer the information from the radio sites to the dispatch and command-and-control points: landline, microwave radio, free space optics, fiber optics and RF control links. Let’s examine each of them.

Landline. Traditional communications systems are linked by landlines, i.e., copper wires. These copper lines are in pairs or in sets of four wires, and are found throughout the world as a primary means of transferring communications-based information.

Copper wires as a medium have advantages and disadvantages. One advantage is that they are available virtually everywhere; another is that their price is low compared with other media. But the recurring costs of transmitting over landlines can be significant over a long period of time. Also, if a problem occurs, a wireline link can be out of service for days before the service is restored.

Microwave. Microwave radio links are the next most common means of connecting radio sites, and of connecting to dispatch and command-and-control. These links are either licensed or unlicensed by the FCC and typically are in the range of 2 GHz to 23 GHz.

Link designs, bands, ranges and bandwidth vary depending on whether the system is licensed or unlicensed and on the frequency band. But there are some basic guidelines for all instances. Let’s start with the link design and the radio link budget. The link design and radio link budget are similar to those in LMR systems with the exception that both ends of the link are fixed in a microwave path, while one end typically is mobile for LMR systems.

The path fade margins that are required are much higher in microwave systems to accommodate for the deep fades that may occur and the inability to move out of the fades. Physical diversity of antennas at either end help, but fade margins of 30 dB are typical. Another design difference concerns the antenna gains. The antennas normally are parabolic dishes and have gains in the 20 to 30 dB range at both ends. This allows path lengths from 10 miles with line of sight for the higher frequencies, to 50 miles or more for the lower frequencies.

In the microwave region of the spectrum, the following bands are used:

  • 2.4 GHz;
  • 4.9 GHz (public safety only, but shared with some mobile applications);
  • 5.2 GHz;
  • 5.8 GHz;
  • 6 GHz;
  • 11 GHz;
  • 18 GHz; and
  • 23 GHz.

Today’s typical microwave systems often consist of an indoor unit (IDU) located inside of a building or cabinet, and a corresponding outdoor unit (ODU) located on the building rooftop, on a tower or on a water tank. The IDU and ODU will be interconnected via an Ethernet LAN cable or a small coaxial cable that carries the information between the IDU and the ODU.

You can find unlicensed channels in the 2.4 GHz and 5.8 GHz bands, but in most instances you will want to use licensed radios in one or more of the other bands.

When designing a microwave system, the transmitter power, transmission line loss (if Ethernet is not used), antenna gain, path loss, receive antenna gain, transmission line loss (if Ethernet is not used) and receiver minimum sensitivity are considered. The signal level must be at least 30 dB above the minimum receiver sensitivity for a path to be viable. One thing to watch out for is a fade margin that is in the order of 60 dB or higher, which can destroy the intermediate frequency amplifiers in the microwave radio receiver. It is imperative to know the maximum and minimum signal levels for a microwave receiver. Sometimes more signal is not better.

The path of a microwave signal should be plotted on a map and also should be visually observed to ensure that there always is a line-of-sight path between the two nodes of the system. Most modern mapping programs will allow you to perform a path analysis and profile of the ground elevation. The 4/3 earth contour must be taken into consideration when plotting the path.

An interference reflection zone exists — called a Fresnel Zone — that can have no obstruction or any metallic objects within it. This will force you to have a larger clearance path than just the line-of-sight tunnel between the two sites.

When an antenna is placed on a structure, it is very important that there is absolutely no movement in any direction of the antenna once it is aimed and optimized for a given path. This includes the movement of the tower itself. Many towers must be guyed for sway once a microwave dish or antenna is placed on that tower. There are special outrigger guy brackets that are available for this purpose.

The bandwidth of a microwave system is directly proportional to the capacity of that system. As you increase the capacity of a given system, the bandwidth will increase. For licensed systems, you are required to stay within your authorized bandwidth.

Many of the newer microwave radio systems use the Internet Protocol (IP) as a means for communications; consequently, all nodes and connections must be part of the same network addressing protocol. Some of the older microwave systems use analog modulation schemes, but all of the new systems are using a digital modulation scheme of various types.

Free space optics. A technology exists where a pair of lasers is used to provide a transmission path across a span of up to one mile. Focused lenses and fiber-optic cables are utilized to provide a high-speed Ethernet LAN connection between two sites.

The main advantage of using free space optics (FSO) is that you can create a path across town without having to bury cable, apply to the FCC for a microwave license or use telephone lines that have recurring charges. The bandwidth varies from 100 Mbps to 1,000 Mbps between the two nodes.

An FSO system consists of a laser encoder, laser receiver, fiber-optic cables, two or four antenna lenses, and a secure mounting system. The installation is simple and the units on the market today can be self-aligning.

There are a few caveats to consider when using this technology:

  • Very stable mountings — with absolutely no sway from wind or any other source — are a must.
  • There can be no obstructions that pass between the two sites.
  • The system cannot be used where heavy fog disrupts the path.
  • If you only need to cross a road or small body of water, this is a great alternative to microwave connectivity.

Fiber. Fiber-optic connectivity is one of the most common methods of tying communications systems together today. The largest expense of a fiber optic (FO) system is the installation. Because of this, it is cheaper over the long run to install more fiber cables than you need when putting in the required cables. These unused cables are called dark cables. Almost all FO systems contain such extra cables for future use.

The FO cable diameter determines how long a run can be made of a single strand of the cable. The 62.5-micrometer diameter cable is called multi-mode, and the run can be up to 1,000 feet. A 9.0-micrometer diameter cable is called single mode, and it can run over 30 miles for a single strand.

A multi-mode cable can be used with either 850 nm or 1300 nm systems, which are the two most common bands used for FO systems. Multi-mode cable will be found in a single building, but single-mode cable will be used to connect multiple sites together in a city or wider area. Single-mode cable usually uses the 1300 nm or 1550 nm bands. Most systems offer a 200 Mbps bandwidth, but the newer systems deliver a 1 Gbps bandwidth.

Just as radio systems have a link power budget, so do FO systems. The transmit output power of +10 dBm to +30 dBm will be put into the FO distribution cable, cable attenuation will range from 5 to 50 dB, and the receiver will have a sensitivity of approximately –30 to –50 dBm for its bottom-line receiver noise floor. If a signal needs to be enhanced because of attenuation, amplifiers are available to boost the signal.

Many cities and right of ways have FO cables running throughout them, and they are available as an alternative to other communications paths for data and voice systems. Some cities install such cable when they do any kind of excavation for water or sewer pipes, so that they can utilize these systems for their internal communications without having to pay any recurring charges to the telephone or cable companies. Other agencies have required the local utility and cable companies to put in extra capacity and dark fibers into their networks as a condition of getting a permit to install cables in their jurisdictions.

A newer form of FO systems uses a technology called Wave Division Multiplex. The 1550 nm band is used for such systems; it has capacity that is 10 to 20 times that of a normal single-mode system. This will allow for extremely high-density data systems to be utilized for current and future needs.

Satellite. In some circumstances, there is no connectivity to a site over land or water. In these cases, satellite systems will be required for the system to work. The geo-stationary satellites reside at 22,000 miles above the equator, and there are dedicated channels available for connectivity. In addition, there are low earth orbiting satellites, called LEOs, and these also work, especially in mobile environments.

As with any communications system, there is a link budget that must be determined for the system to work. You will need to know the transmitter power, antenna gain, coaxial loss and receiver sensitivity in order to engineer a reliable path. In addition, cloud cover can interfere with satellite communications, unless you have sufficient antenna gain, transmitter power or receiver sensitivity, or a combination of all three factors to make the path reliable.

Satellite system bandwidth is available, but it always comes with a high recurring price tag.

RF control links. If you only have a few channels to control, conventional radio channels will work for this purpose. In addition, most repeater systems use RF control base stations for the fixed locations in the system. The simple systems and trunking systems will use mobile units with a base station power supply that provides the 12 VDC needed for the mobile unit from the 120 VAC in the building. Some systems will use regular base stations as the control stations for the repeater links. This normally is the case when there are many other radios in close proximity to each other.

In the U.S., most control links use one of the following bands for control stations:

  • 72–75 MHz,
  • 450–470 MHz,
  • 927–928 MHz,
  • 950–960 MHz, or
  • 169–173 MHz (SCADA systems).

All VHF, UHF, 800, and 900 MHz systems require the control links to be licensed. The FCC does allow you to license control stations under the 6.1 Meter Rule. This rule lets the licensee install a control base anywhere in the state in which it is licensed, as long as the antenna is no more than 20 feet above ground or 20 feet above an existing building.

In every radio system, the control station must use a directional antenna, unless the system itself has multiple repeaters in different directions, or the control station must operate on different channels with multiple sites involved.

Control stations can be licensed to go on buildings, towers, water tanks or any other place. If the antenna is required to be over 20 feet above one of the structures, the station’s location must be specified in the license.

Editor's note: The last entry in the LMR series, "The lynchpin," included some factual errors. See the corrected version online. Urgent Communications regrets the errors.

Part 1: Class is in session: Basic LMR and FCC definitions
Part 2: Start at the beginning: Understanding LMR user needs
Part 3: The devil's in the details: Conducting a user-needs survey
Part 4: Decisions, decisions: Understanding the LRM procurement process
Part 5: Let's get started: System engineering begins with RF planning
Part 6: The lynchpin: Receiver planning and noise interference
Part 8: The next piece of the puzzle: Understanding dispatch communications
Part 9: Now the real work begins: How to select a suitable LMR site
Part 10: The bane of your existence: How to deal with RF interference
Part 11: Winning the battle: What causes radio frequency interference

Ira Wiesenfeld, P.E., is a consulting engineer who has been involved in the radio communications business since 1966. He is a senior member of the IEEE and has been a licensed amateur radio operator since 1963. He can be reached at [email protected].

Robert C. Shapiro, P.E, is the senior manager-systems engineering for PlantCML, an EADS Company. He serves on the TIA TR8 committee as the TSB-88.4-C task-group chair and is a senior member of the IEEE. He can be reached at [email protected].

Tags: Call Center/Command Wireless Networks

Most Recent


  • How AT&T won DFW Airport's $10 million private 5G business
    According to Mike Youngs, it all started with the bathrooms at Dallas Fort Worth (DFW) International Airport. Youngs, the airport’s VP for IT, wanted to use wireless technology to reduce crowding in restroom lines during the COVID-19 pandemic. His team installed sensors and lights above stalls and monitors outside restrooms to let people know when […]
  • Russia's war in Ukraine shows cyberattacks can be war crimes
    Russia’s cyberattacks against Ukrainian civilian and critical infrastructure has shown what it looks like when cyberattacks are part of warfare. What remains to be seen is whether the world will treat them as war crimes. “For too long, the world has been considering cyber terrorism as something unrealistic, too sci-fi-ish, and cyber weapons as not […]
  • FCC grants 700 MHz Band 14 license renewal to FirstNet Authority
    An FCC bureau yesterday renewed the FirstNet Authority’s spectrum license into at least 2027, allowing the nationwide public-safety broadband network (NPSBN) to continue operating over the 700 MHz Band 14 airwaves—a key component of the FirstNet Authority’s 25-year agreement with contractor AT&T. Approved by the FCC Public Safety and Homeland Security Bureau (PSHSB), the license […]
  • How vehicle insurance and autonomy intertwined
    In early 2023 Oxbotica claimed at an event, which was held at Lloyd’s of London about the Future of Autonomy that insurance and autonomy are intertwined. At the event, Sam Tiltman, sharing economy and mobility leader for the UK & Ireland at Marsh, claimed that the combined impact of Mobility-as-a-Service (MaaS), electric vehicles and automation is huge. […]

Leave a comment Cancel reply

To leave a comment login with your Urgent Comms account:

Log in with your Urgent Comms account

Or alternatively provide your name, email address below:

Your email address will not be published. Required fields are marked *

Related Content

  • The battle over connected cars drags on
  • UK officials revamp ESN plans again, target Airwave-to-LTE transition for end of 2026
  • PSCR: Dereck Orr highlights features of June 21-24 virtual event
  • FirstNet buildout on pace for March 2023 completion, AT&T official says

Commentary


Updated: How ‘sidelink’ peer-to-peer communications can enhance public-safety operations

  • 1
27th February 2023

NG911 needed to secure our communities and nation

24th February 2023

How 5G is making cities safer, smarter, and more efficient

26th January 2023
view all

Events


UC Ezines


IWCE 2019 Wrap Up

13th May 2019
view all

Twitter


UrgentComm

How AT&T won DFW Airport’s $10 million private 5G business dlvr.it/Spj4Pt

27th May 2023
UrgentComm

Russia’s war in Ukraine shows cyberattacks can be war crimes dlvr.it/Spj3c2

27th May 2023
UrgentComm

FCC grants 700 MHz Band 14 license renewal to FirstNet Authority dlvr.it/Spj2Ny

27th May 2023
UrgentComm

Broadband for Critical Communications Everywhere Providing Connectivity When Seconds Count dlvr.it/Sph602

26th May 2023
UrgentComm

How vehicle insurance and autonomy intertwined dlvr.it/SpglBb

26th May 2023
UrgentComm

World’s least-expensive self-driving vehicle revealed dlvr.it/Spgc88

26th May 2023
UrgentComm

Voice calling is finally making its way onto 5G dlvr.it/SpdtYW

26th May 2023
UrgentComm

With many cities facing a fiscal cliff as ARPA funding ends, debt ceiling debate continues on Capitol Hill dlvr.it/Spdsnq

26th May 2023

Newsletter

Sign up for UrgentComm’s newsletters to receive regular news and information updates about Communications and Technology.

Expert Commentary

Learn from experts about the latest technology in automation, machine-learning, big data and cybersecurity.

Business Media

Find the latest videos and media from the market leaders.

Media Kit and Advertising

Want to reach our digital and print audiences? Learn more here.

DISCOVER MORE FROM INFORMA TECH

  • American City & County
  • IWCE
  • Light Reading
  • IOT World Today
  • Mission Critical Technologies
  • TU-Auto

WORKING WITH US

  • About Us
  • Contact Us
  • Events
  • Careers

FOLLOW Urgent Comms ON SOCIAL

  • Privacy
  • CCPA: “Do Not Sell My Data”
  • Cookie Policy
  • Terms
Copyright © 2023 Informa PLC. Informa PLC is registered in England and Wales with company number 8860726 whose registered and Head office is 5 Howick Place, London, SW1P 1WG.