https://urgentcomm.com/wp-content/themes/ucm_child/assets/images/logo/footer-new-logo.png
  • Home
  • News
  • Multimedia
    • Back
    • Multimedia
    • Video
    • Podcasts
    • Galleries
    • IWCE’s Video Showcase
    • Product Guides
  • Commentary
    • Back
    • Commentary
    • Urgent Matters
    • View From The Top
    • All Things IWCE
    • Legal Matters
  • Resources
    • Back
    • Resources
    • Webinars
    • White Papers
    • Reprints & Reuse
  • IWCE
    • Back
    • IWCE
    • Conference
    • Special Events
    • Exhibitor Listings
    • Premier Partners
    • Floor Plan
    • Exhibiting Information
    • Register for IWCE
  • About Us
    • Back
    • About Us
    • Contact Us
    • Advertise
    • Terms of Service
    • Privacy Statement
    • Cookie Policy
  • Related Sites
    • Back
    • American City & County
    • IWCE
    • Light Reading
    • IOT World Today
    • Mission Critical Technologies
    • TU-Auto
  • In the field
    • Back
    • In the field
    • Broadband Push-to-X
    • Internet of Things
    • Project 25
    • Public-Safety Broadband/FirstNet
    • Virtual/Augmented Reality
    • Land Mobile Radio
    • Long Term Evolution (LTE)
    • Applications
    • Drones/Robots
    • IoT/Smart X
    • Software
    • Subscriber Devices
    • Video
  • Call Center/Command
    • Back
    • Call Center/Command
    • Artificial Intelligence
    • NG911
    • Alerting Systems
    • Analytics
    • Dispatch/Call-taking
    • Incident Command/Situational Awareness
    • Tracking, Monitoring & Control
  • Network Tech
    • Back
    • Network Tech
    • Interoperability
    • LMR 100
    • LMR 200
    • Backhaul
    • Deployables
    • Power
    • Tower & Site
    • Wireless Networks
    • Coverage/Interference
    • Security
    • System Design
    • System Installation
    • System Operation
    • Test & Measurement
  • Operations
    • Back
    • Operations
    • Critical Infrastructure
    • Enterprise
    • Federal Government/Military
    • Public Safety
    • State & Local Government
    • Training
  • Regulations
    • Back
    • Regulations
    • Narrowbanding
    • T-Band
    • Rebanding
    • TV White Spaces
    • None
    • Funding
    • Policy
    • Regional Coordination
    • Standards
  • Organizations
    • Back
    • Organizations
    • AASHTO
    • APCO
    • DHS
    • DMR Association
    • ETA
    • EWA
    • FCC
    • IWCE
    • NASEMSO
    • NATE
    • NXDN Forum
    • NENA
    • NIST/PSCR
    • NPSTC
    • NTIA/FirstNet
    • P25 TIG
    • TETRA + CCA
    • UTC
Urgent Communications
  • NEWSLETTER
  • Home
  • News
  • Multimedia
    • Back
    • Video
    • Podcasts
    • Omdia Crit Comms Circle Podcast
    • Galleries
    • IWCE’s Video Showcase
    • Product Guides
  • Commentary
    • Back
    • All Things IWCE
    • Urgent Matters
    • View From The Top
    • Legal Matters
  • Resources
    • Back
    • Webinars
    • White Papers
    • Reprints & Reuse
    • UC eZines
    • Sponsored content
  • IWCE
    • Back
    • Conference
    • Why Attend
    • Exhibitor Listing
    • Floor Plan
    • Exhibiting Information
    • Join the Event Mailing List
  • About Us
    • Back
    • About Us
    • Contact Us
    • Advertise
    • Cookie Policy
    • Terms of Service
    • Privacy Statement
  • Related Sites
    • Back
    • American City & County
    • IWCE
    • Light Reading
    • IOT World Today
    • TU-Auto
  • newsletter
  • In the field
    • Back
    • Internet of Things
    • Broadband Push-to-X
    • Project 25
    • Public-Safety Broadband/FirstNet
    • Virtual/Augmented Reality
    • Land Mobile Radio
    • Long Term Evolution (LTE)
    • Applications
    • Drones/Robots
    • IoT/Smart X
    • Software
    • Subscriber Devices
    • Video
  • Call Center/Command
    • Back
    • Artificial Intelligence
    • NG911
    • Alerting Systems
    • Analytics
    • Dispatch/Call-taking
    • Incident Command/Situational Awareness
    • Tracking, Monitoring & Control
  • Network Tech
    • Back
    • Cybersecurity
    • Interoperability
    • LMR 100
    • LMR 200
    • Backhaul
    • Deployables
    • Power
    • Tower & Site
    • Wireless Networks
    • Coverage/Interference
    • Security
    • System Design
    • System Installation
    • System Operation
    • Test & Measurement
  • Operations
    • Back
    • Critical Infrastructure
    • Enterprise
    • Federal Government/Military
    • Public Safety
    • State & Local Government
    • Training
  • Regulations
    • Back
    • Narrowbanding
    • T-Band
    • Rebanding
    • TV White Spaces
    • None
    • Funding
    • Policy
    • Regional Coordination
    • Standards
  • Organizations
    • Back
    • AASHTO
    • APCO
    • DHS
    • DMR Association
    • ETA
    • EWA
    • FCC
    • IWCE
    • NASEMSO
    • NATE
    • NXDN Forum
    • NENA
    • NIST/PSCR
    • NPSTC
    • NTIA/FirstNet
    • P25 TIG
    • TETRA + CCA
    • UTC
acc.com

content


Getting Grounded

Getting Grounded

For a PDF version of this story, which includes diagrams, click here. With more than 150 lightning strikes per second, damage to equipment brings losses
  • Written by Urgent Communications Administrator
  • 1st April 2002

For a PDF version of this story, which includes diagrams, click here.

With more than 150 lightning strikes per second, damage to equipment brings losses exceeding $26 billion annually in North America and nearly three times that amount worldwide. Insurance payments for lightning damage claims total 6.5% of all property and casualty claims. Ironically, damage to equipment can be prevented.

Methods that prevent lightning damage are simple, reliable and inexpensive when compared to the cost of repair — not to mention possible injury or death. Remarkably, methods for lightning protection cannot be found in building codes such as the National Electrical Code or the National Electrical Safety Code. Yet, builders rely on these codes for practically all construction in the United States.

Electrical equipment damage from lightning usually can be blamed on one or two reasons: 1) improper or insufficient grounding and 2) no special protection from a ground potential rise (GPR). Improper or insufficient grounding allows equipment to be stressed or damaged by a difference in electrical potential from nearby equipment and metal objects as current flow is misdirected. A lack of special protection from a GPR allows equipment to be stressed because of its attachment to a remote ground through communications wire lines or power-supply wiring.

Standard protection for the termination of communications wire-line services is the gas tube. Gas tubes are shunting devices that can be found on virtually every telephone pair terminated in homes and buildings. They are designed to shunt (connect to ground) “incoming energy,” and thereby protect equipment and people from harm.

However, no shunting device protects electronic equipment from a GPR, or “outgoing energy.” High outgoing current flow from a lightning strike effectively lifts electrical ground. During a GPR, the shunting devices are connected to an elevated ground and merely offer an additional current path from the site to a remote ground. In this unfortunate way, gas tubes guarantee a connection of the communications path in the reverse direction from which they were intended to operate when there is a GPR. (See Figure 1.)

Dangers from outgoing energy

The outgoing energy from a GPR places most telephone and power installations at risk for equipment damage and the people near them at risk for harm. One of the most dangerous locations for people is a 9-1-1 public safety answering point. The typical PSAP is a small building beneath a large radio tower. The tall tower supports radio communications antennas and forms a lightning target. Workers taking emergency calls must be at the PSAP phones constantly. They do not have the luxury of staying off the phone during lightning storms, which is recommended in virtually every telephone book.

The only effective method of protecting equipment connected to wireline communications from a GPR is through isolation — using optical isolators or isolation transformers. These devices prevent current flow. With no metallic path, there will not be outgoing current flow, equipment damage or risk of injury to workers. (See Figure 2.)

To control lightning-strike energy as it dissipates requires division. There is no substitute for division for successfully dissipating the energy because of the magnitude of the current and the resulting surge impedance of any single dissipation path. Using 10 radials connected to a ground ring that is bonded to an antenna divides lightning current into 10 smaller segments. This division helps to ensure that the lightning will follow the grounding conductors for dissipation into the earth. The improved dissipation also serves to reduce the resulting GPR to the adjacent equipment-building grounding system.

The copper wire grounding system can be greatly improved by placing conducting cement around the radials at the time of installation. The cement hardens into concrete, protecting the grounding system and giving it many more years of life. It also gives the system a lower ground resistance.

Tower location

Equipment buildings must be at least 30 feet from antenna towers. This is done to avoid damage caused to electronic circuits by the magnetic field associated with lightning. Magnetic field strength drops off as the square of the distance. If the real estate configuration prevents separating the building at least 30 feet from its antenna tower, consideration must be given to engineering a Faraday cage (wire mesh) around the interior of the building. Without a Faraday cage, equipment damage cannot be prevented no matter how well the equipment is grounded or isolated from remote ground.

Another reason to place equipment buildings or shelters at least 30 feet from antenna towers is to keep the lightning GPR at the tower base from saturating the building grounding system before most of the energy is dissipated in the earth. The grounding systems for the building and its tower must be bonded together at one single point, but a bond of 30 feet or more will significantly reduce the resulting GPR at the shelter because of the impedance of the lengthy bond. This is a rare exception in which a lengthy bond is an advantage in supporting a robust grounding system.

Single-point grounding (a “ground window”) is absolutely necessary to prevent equipment damage because the GPR from lightning strikes is a wave of rising voltage or an energy surge that passes through a grounding system. The nature of the wave demands that all equipment should be bonded to the grounding system at one location to ensure that the electrical potential of every metallic object connected to it rises and falls together. (See Figure 3.)

Anyone using equipment susceptible to GPR must be protected by a single-point grounding system to guarantee that they won’t be injured by touching different pieces of equipment that otherwise might have different and harmful electrical potentials when lightning strikes. This phenomenon is also known as “touch potential.”

The use of a ground window (also called a bulkhead panel or waveguide hatch) where coax cables, waveguide and antenna wires penetrate the wall of the equipment building is indispensable. The bulkhead is made of solid copper. Its proper engineering design and installation will ensure that lightning energy does not enter the equipment building on cables from the antenna tower.

The bulkhead must be bonded to the building grounding system at the single-point grounding location — the same single point ground where the tower grounding system is bonded to the building grounding system.

Isolate wireline comms

A lightning strike to a grounding system produces an elevated ground or GPR. Any equipment bonded to the grounding system and also connected to wireline communications is likely to be damaged by outgoing current seeking remote ground. Individuals who may be working on equipment connected to the wire lines could be harmed because they would be in the path of the outgoing current.

An engineering design that protects this equipment isolates the wireline communications from the remote ground. Isolation is accomplished using optical isolators, isolation transformers or both. The isolation equipment, called the high-voltage interface, is housed together and mounted on a non-conducting surface in a non-conducting cabinet.

The HVI isolates the communications equipment during a GPR and prevents a current from flowing from the grounding system with higher electrical potential to a grounding system with a lower potential. The isolation completely protects equipment from damage and people from harm.

Simple lightning protection

Simple, reliable and inexpensive protection methods can prevent lightning damage to equipment. The three most important concepts are:

  1. divide and control the lightning strike energy.

  2. design a true single-point ground system.

  3. isolate wire-line facilities from a remote ground.

A reliable, well engineered grounding design will all but completely eliminate lightning threats to equipment and people.


Duckworth is strategic accounts manager at SNC Manufacturing, Oshkosh, WI.

Tags: content

Most Recent


  • Getting Grounded
    Newscan: Securing the Internet of Things is quite a challenge
    Also: EWA requests dismissal of 900 MHz applications; TIA names tech and policy priorities for 2014; IJIS Institute names Shumate Award winner; App makes bus waits more tolerable; a Blackberry comeback may be in the offing.
  • Getting Grounded
    Newscan: FCC certifies Carlson Wireless's white-space radio
    Also: Congress looks to revamp telecom law; Obama to place some restraints on surveillance; IEEE to study spectrum-occupancy sensing for white-spaces broadband; Major Swedish transport operator opts for Sepura TETRA radios; RFMD to partner on $70 million next-generation power grid project; NENA opens registratiuon for "911 Goes to Washington."
  • Getting Grounded
    Newscan: A look at the critical job of 911 dispatchers
    Also: NYC launches website for tracking 911 response times; Oregon implements 911 on pre-paid cell phones; LightSquared wants to keep spectrum assets; Harris receives multiple government orders; FCC extends rebanding financial reconciliation deadline; Zetron gear at core of communications system upgrade; Ritron debuts wireless access control system; EWA seeks policy review of VHF vehicular repeater system deployments.
  • Getting Grounded
    Newscan: Average peak data rates of 144 MB/s average realized in tests with CAT 4 LTE device
    Also: Verizon, T-Mobile to swap unused spectrum to improve coverage; Internet giants oppose surveillance--but only when the government does it; FCC Chairman says incentive auction will be delayed until middle of 2015; FCC chair announces staff appointments; Alcatel-Lucent names Tim Krause as chief marketing officer; New Jersey county deploys TriTech CAD system; Toronto airport deploys 26-position Zetron console system;

Leave a comment Cancel reply

To leave a comment login with your Urgent Comms account:

Log in with your Urgent Comms account

Or alternatively provide your name, email address below:

Your email address will not be published. Required fields are marked *

Related Content

  • RugGear: Contributing to the future of mission-critical broadband communication review and market vision
  • Photo gallery: 2014 Communications Marketing Conference (CMC) in Tucson
  • Getting Grounded
    Top 5 Stories - Week of Sept. 22
  • Getting Grounded
    RCA plans to expand this year's Technical Symposium

Commentary


How 5G is making cities safer, smarter, and more efficient

26th January 2023

3GPP moves Release 18 freeze date to March 2024

18th January 2023

Do smart cities make safer cities?

  • 1
6th January 2023
view all

Events


UC Ezines


IWCE 2019 Wrap Up

13th May 2019
view all

Twitter


UrgentComm

Public-safety coalition renews efforts to secure federal NG911 funding dlvr.it/ShwGfn

4th February 2023
UrgentComm

Newscan: Cyberattacks on DoE national labs draw lawmaker scrutiny dlvr.it/Shvpw3

3rd February 2023
UrgentComm

The shine begins to wear off 5G private wireless dlvr.it/Shth0P

3rd February 2023
UrgentComm

Phishers trick Microsoft into granting them ‘verified’ Cloud Partner status dlvr.it/Shqngn

2nd February 2023
UrgentComm

Shapeshifting robot can morph from a liquid to a solid dlvr.it/Shqk9K

2nd February 2023
UrgentComm

Automakers against stampede to BEV dominance dlvr.it/ShpX08

2nd February 2023
UrgentComm

FCC nominee Gigi Sohn headed for third Senate hearing dlvr.it/ShpDcZ

1st February 2023
UrgentComm

Sign up to learn how to successfully manage your Motorola ASTRO® 25 System: spr.ly/60143j8fp https://t.co/XcxiUwzN27

1st February 2023

Newsletter

Sign up for UrgentComm’s newsletters to receive regular news and information updates about Communications and Technology.

Expert Commentary

Learn from experts about the latest technology in automation, machine-learning, big data and cybersecurity.

Business Media

Find the latest videos and media from the market leaders.

Media Kit and Advertising

Want to reach our digital and print audiences? Learn more here.

DISCOVER MORE FROM INFORMA TECH

  • American City & County
  • IWCE
  • Light Reading
  • IOT World Today
  • Mission Critical Technologies
  • TU-Auto

WORKING WITH US

  • About Us
  • Contact Us
  • Events
  • Careers

FOLLOW Urgent Comms ON SOCIAL

  • Privacy
  • CCPA: “Do Not Sell My Data”
  • Cookie Policy
  • Terms
Copyright © 2023 Informa PLC. Informa PLC is registered in England and Wales with company number 8860726 whose registered and Head office is 5 Howick Place, London, SW1P 1WG.